SiteCert · Blog
Getting to a World Class Inspection Platform
The journey over 20 years, three platform rewrites and 18 months of migration — and how we got to SiteCert 4.

After 20 years in business and three full iterations of our product, we're now on SiteCert 4. This is the story of how we got here — and what the new platform means for you. For the technical detail, see our post What's Under the Hood of the New SiteCert Platform.
Twenty years, four platforms
When we first launched in 2007, Android didn't exist and the iPhone was brand new, so we built on Windows Mobile. The handhelds were clunky PDAs that you only ever saw with DHL drivers at the time. We had to sell the hardware as well as the software, and each handheld cost around £1,200.
Around 2009 SiteCert migrated to RhoElements, which enabled one version to be maintained across Android and iOS (Apple devices). There was one customer who continued to run Windows Mobile until Windows Mobile was finally discontinued.
There were other iterations of the SiteCert platform throughout the years as the platform needed to be upgraded. During a customer migration in 2025, we discovered they were still using the RhoElements version they'd installed in 2013 — on a Windows 7 PC.
Why we migrated
The old platform had done its job, but it was holding us back. Adding new features took longer than it should. While many of our customers wanted to stay on the platform, Google had other ideas: new security requirements for apps on the Google Play Store forced our hand.
Some parts of the system were built on technology that is no longer actively supported. And we knew we could give customers a faster, simpler experience if we started fresh.
Our goals for the new platform were simple:
- Faster — quicker page loads and quicker everyday tasks
- More secure — built on modern, supported technology from day one
- Easy to use — just like every version before it, no training required
- Ready for the future — so we can ship new features much faster
How we did it
Moving 20 years of data and 16 years of SmartCodes history is not something you rush. We planned the migration in stages over 18 months:
- 1Mapping everything. We audited every customer account, every SmartCode and every integration before moving a single record.
- 2Building in parallel. The new platform was built and tested alongside the old one, so customers were never left without service.
- 3Starting with new customers. We rolled the new platform out to new customers first. Many of our long-standing customers had been through upgrades with us before, so rather than ask them to test it, we used feedback from new customers to shape the final version.
- 4Moving in waves. We migrated accounts in batches, checking each one before moving on.
- 5Checking and double-checking. Every migrated account was verified to make sure nothing was lost.
What it means for you
For most customers, the move happened with little or no effort on your part. Your account, your data and your users all moved across seamlessly.
You'll notice a fresh look, faster performance and a set of new features we'll be sharing over the coming weeks.
Thank you
A migration like this only works with patient, loyal customers, and we've been lucky to have them for 20 years. Thank you for sticking with us. If you have any questions about the move, our team is here to help at sales@sitecert.net
